Two separate things

Suppliers to the NHS often meet two pieces of carbon evidence and treat them as one. They are not.

One does not replace the other. Completing the Evergreen assessment does not remove the need for a plan, and publishing a plan does not complete the assessment.

Where they overlap

Both rest on the same underlying information: your emissions, your net zero commitment and the steps you are taking to reduce emissions. NHS England's 2027 plan requirements describe a plan structured like the PPN 006 template, covering Scope 1, Scope 2 and all relevant Scope 3 emissions under the GHG Protocol, reported in CO2e.

Because the data is shared, the work overlaps. A supplier that has measured its emissions properly for its plan has done much of the groundwork for the assessment, and the other way round.

Who awards a level

Be wary of anyone who offers to give you a level. What any adviser can do is help you get your evidence ready. The level itself comes from NHS England.

When the NHS asks for them

NHS England has set out when these are needed for some procurements. Two examples:

  • For NHS England Medicines tenders, a valid Evergreen assessment has been required since January 2024, and a Carbon Reduction Plan meeting the NHS requirements since April 2024.
  • From 1 April 2027, new NHS England guidance sets what a plan must contain for in-scope procurements of £5 million a year and above (including VAT), and for all new frameworks regardless of value. Lower-value procurements above the published thresholds use the 2024 requirements. Our article on the April 2027 changes covers this in more detail.

The background is the NHS's own net zero targets: 2040 for the emissions it controls directly, and 2045 for the emissions it influences through the goods and services it buys from suppliers.

What the 2027 plan adds

For in-scope procurements from 1 April 2027, the NHS plan asks for more than a PPN 006 plan in one important way: it covers all relevant Scope 3 categories under the GHG Protocol, not only the five PPN 006 lists. It also asks for environmental management measures and approval by the board or a director.

Plans are assessed pass or fail, and are not scored or compared against each other. SMEs and VCSEs with an acceptable reason for missing data may still pass if they explain the gap and how they will improve it. From April 2028, NHS England also plans requirements for footprinting individual products, with the scope and method still to be decided.

Keeping them in step

Some practical habits help:

  • One set of figures. Use the same emissions numbers, reporting year and baseline in your plan and your assessment. If they differ, be ready to explain why.
  • Update together. When you update your plan (at least once a year under PPN 006), check whether your assessment answers need updating too.
  • Keep your workings. Both are based on what you report. Keep a record of the data and method behind each figure.
  • Publish the plan where buyers can find it. A plan should be clearly signposted on your website.

To see what buyers can see about your company's plan, run a CRP Check.