Compliance guides

What a Carbon Reduction Plan is, and what it is not

A Carbon Reduction Plan sets out a supplier's net zero commitment, emissions and reduction plans. It is self-declared, not certified. Here is what that means.

By Evergreener · 5 min read

A short definition

A Carbon Reduction Plan (often shortened to CRP) is a public document in which a supplier states its commitment to reach net zero, reports its greenhouse gas emissions, and sets out how it intends to reduce them.

The format comes from UK government procurement policy. Central government asks for one under PPN 006 (formerly PPN 06/21) on contracts worth more than £5 million a year. NHS England uses the same structure for its own requirements.

What is inside one

The PPN 006 template has a header and seven sections. Read as a checklist, that is eight parts:

  • Supplier name and publication date
  • Commitment to achieving net zero (by 2050 at the latest)
  • Baseline emissions footprint
  • Current emissions reporting
  • Emissions reduction targets
  • Carbon reduction projects, completed and planned
  • Declaration and sign off
  • Signed on behalf of the supplier

The emissions figures are reported in carbon dioxide equivalent (CO2e). Under PPN 006 they cover Scope 1, Scope 2 and five categories of Scope 3. The baseline is the starting point that later years are compared against, which is why it matters that it is stated clearly.

Who writes it and who signs it

The supplier writes its own plan. Under PPN 006 it must be approved by a director or equivalent senior leadership, or a designated member for a limited liability partnership.

The plan must be published and clearly signposted on the supplier's UK website, and updated at least once a year. A supplier without a website must give a written copy to anyone who asks, within 30 days.

Self-declared: what that means

A Carbon Reduction Plan is self-declared. The PPN 006 technical standard notes that verification standards exist, but says there is no requirement to have the carbon footprint audited.

That has two practical consequences.

  • For suppliers: the figures and statements are yours, and your director signs for them. Keep a record of how you worked them out, so you can answer questions.
  • For buyers: a published plan tells you what the supplier says, not that someone else has checked it. If a figure matters to your decision, ask how it was calculated.

Keeping it current

A plan is not a one-off. PPN 006 asks for it to be updated regularly, and at least once a year. The technical standard says it should be reviewed and updated within six months of the end of your financial year, so the figures follow your reporting cycle.

Each update is a chance to replace estimates with better data, report progress against your baseline, and add projects you have completed. Keep earlier versions, so you can show how your emissions and plans have changed over time. If you supply the NHS, check whether the 2027 NHS requirements apply to your procurements: they ask for all relevant Scope 3 categories, not only the five PPN 006 lists.

What a plan is not

  • Not a certificate. Nobody issues a plan or stamps it as correct. Evergreener does not verify, certify or score plans either.
  • Not a pass in itself. Only the buying authority decides whether a plan meets the requirements of its contract.
  • Not an NHS Evergreen level. The NHS Evergreen sustainable supplier assessment is separate. Only NHS England, through Atamis, awards a level.
  • Not an SECR report. Streamlined Energy and Carbon Reporting is a company-law requirement for larger companies, reported in the annual report. Much of the same data feeds both, but they are different documents.

Who needs one

You are most likely to need a plan if you bid for central government contracts worth more than £5 million a year, or if you supply the NHS. A buyer can also ask for one on other contracts, and any business can choose to publish one.

The Compliance Guide walks through the three main triggers. To see what is on record for a company, run a CRP Check.