For public buyers: reading a Carbon Reduction Plan in ten minutes

A checklist for public buyers reading a supplier's Carbon Reduction Plan: the template parts to look for and the questions to ask when something is missing.

By Evergreener · 6 min read

Before you start

This guide is for public sector buyers reading a supplier's Carbon Reduction Plan, for example under PPN 006 (formerly PPN 06/21). Under PPN 006 the plan is a condition of participation, used when assessing technical ability, and the requirement must be relevant and proportionate to the contract.

Keep in mind that a plan is self-declared. The supplier writes it and a director signs it off, and there is no requirement to have the footprint audited. You are reading what the supplier says about itself. Your own tender documents set what the contract requires.

The eight parts to look for

The PPN 006 template has a header and seven sections. Go through them in order and tick each one off:

  • Supplier name and publication date
  • Commitment to achieving net zero (by 2050 at the latest)
  • Baseline emissions footprint
  • Current emissions reporting
  • Emissions reduction targets
  • Carbon reduction projects, completed and planned
  • Declaration and sign off
  • Signed on behalf of the supplier

A few things to look at as you go:

  • Commitment: net zero by 2050 at the latest, stated plainly.
  • Baseline: a baseline year and the emissions for that year, so later figures can be compared with it.
  • Current emissions: Scope 1, Scope 2 and the five Scope 3 categories PPN 006 asks for (upstream transportation and distribution, waste generated in operations, business travel, employee commuting, and downstream transportation and distribution).
  • Targets and projects: what the supplier plans to reduce, by when, and what it has already done.
  • Sign-off: a director or equivalent, or a designated member for an LLP, with a date.

Questions to ask

A missing or unclear part does not mean a supplier has done something wrong. It may be a drafting gap, a new business, or data still being gathered. Treat each of these as a question to put to the supplier:

  • No baseline year? Ask which year the supplier measures progress against, and what its emissions were in that year.
  • A net zero date later than 2050? PPN 006 asks for 2050 at the latest. Ask whether the date is a typing error or a different commitment.
  • Reductions that rely on offsetting? Ask how much of the planned reduction comes from cutting the supplier's own emissions, and how much from offsetting.
  • No sign-off, or no date? Ask who approved the plan and when.
  • Not updated in the last 12 months? PPN 006 asks for updates at least once a year. Ask whether a newer version exists.
  • Scope 3 categories missing? Ask whether they were left out because they do not apply, or because the data is not ready yet.
  • Not on the supplier's website? PPN 006 asks for the plan to be published and clearly signposted there. Ask where it is published.

For NHS procurements from 1 April 2027, NHS England's guidance says SMEs and VCSEs with an acceptable reason for missing data may still pass if they explain the gap and the steps they are taking to improve it. That is another reason to ask rather than assume.

What a plan cannot tell you

A plan cannot show that its figures are correct. It is not a certificate, a score or an NHS Evergreen level, and it does not compare one supplier with another. NHS England's 2027 guidance says plans will be assessed pass or fail and "will not be scored or compared against each other".